$412k
The one that took eleven months and four champions
A regional carrier with 1,400 trucks and a twelve-year-old dispatch system nobody wanted to be responsible for replacing. My first champion left the company in month three. The second was overruled.
What worked was going sideways: I stopped selling to operations and built the case with their safety director, who could quantify what the old system cost in DOT violations. The business case that closed it was about compliance risk, not efficiency, and I would not have found it from a discovery call script.